TotalEnergies Appoints Expert to Evaluate Land Acquisition for Uganda, Tanzania Pipeline Projects
(P&GJ) — Patrick Pouyanné, Chairman and CEO of TotalEnergies, has tasked Lionel Zinsou, a recognized expert in African economic development, with evaluating the land acquisition program conducted in Uganda and Tanzania as part of the Tilenga and EACOP (East African Crude Oil Pipeline) projects, along with the socio-economic development initiatives linked to this program.
As the land acquisition process draws to a close, this mission will evaluate the land acquisition procedures implemented, the conditions for consultation, compensation and relocation of the populations concerned, and the grievance handling mechanism.
It will also assess the actions taken by TotalEnergies EP Uganda and EACOP to contribute to the improvement of the living conditions for the people affected by these land acquisitions and suggest additional measures to be implemented if needed.
The mission will submit its report by April 2024, and its conclusions will be shared with the Tilenga and EACOP project partners.
The Tilenga and EACOP projects include a land acquisition program covering some 6,400 hectares, carried out on behalf of the Ugandan and Tanzanian governments. This program concerns 19,140 households and communities owning or using plots of land and includes the relocation of 775 primary residences. To date, 98% of the households concerned have signed compensation agreements, 97% have received their compensation, and 98% of households to be relocated have taken possession of their new homes.
The Tilenga upstream development project in Uganda is carried out by TotalEnergies (56.67%, operator), CNOOC (28.33%) and UNOC (15%). Production from the oil fields in Uganda will be transported to the port of Tanga in Tanzania through the cross-border pipeline developed by the EACOP Company, whose shareholders are TotalEnergies (62%), UNOC (15%), TPDC (15%) and CNOOC (8%).
Related News
Related News

- Kinder Morgan Proposes 290-Mile Gas Pipeline Expansion Spanning Three States
- Valero Plans to Shut California Refinery, Takes $1.1 Billion Hit
- Three Killed, Two Injured in Accident at LNG Construction Site in Texas
- Tallgrass to Build New Permian-to-Rockies Pipeline, Targets 2028 Startup with 2.4 Bcf Capacity
- TC Energy Approves $900 Million Northwoods Pipeline Expansion for U.S. Midwest
- U.S. Pipeline Expansion to Add 99 Bcf/d, Mostly for LNG Export, Report Finds
- Enbridge Adds Turboexpanders at Pipeline Sites to Power Data Centers in Canada, Pennsylvania
- Great Basin Gas Expansion Draws Strong Shipper Demand in Northern Nevada
- Cheniere Seeks FERC Approval to Expand Sabine Pass LNG Facility
- Heath Consultants Exits Locate Business to Expand Methane Leak Detection Portfolio
Comments