China's CNOOC Receives Approval for Second LNG Berth at Yancheng Port
2/20/2024
(Reuters) — Chinese state-owned CNOOC has received government approval to build a second berth at its LNG receiving terminal in Yancheng in eastern Jiangsu province, according to a statement from the Shanghai Petroleum and Natural Gas Exchange on Tuesday.
The second berth will be one of four such berths on a new platform and will have annual throughput capacity of 6 million metric tons alongside 4 million tons loading and offloading capacity, the statement said.
The addition is part of an expansion project for CNOOC's Yancheng green energy port, which is designed to serve the natural gas needs of the provinces of Jiangsu, Anhui, Henan and Shandong, the statement said.
Related News
Related News
Sign up to Receive Our Newsletter

- 1,000-Mile Pipeline Exit Plan by Hope Gas Alarms West Virginia Producers
- Valero Plans to Shut California Refinery, Takes $1.1 Billion Hit
- Three Killed, Two Injured in Accident at LNG Construction Site in Texas
- Greenpeace Ordered to Pay $667 Million to Energy Transfer Over Dakota Access Pipeline Protests
- Boardwalk’s Texas Gas Launches Open Season for 2 Bcf/d Marcellus-to-Louisiana Pipeline Expansion
- New Alternatives for Noise Reduction in Gas Pipelines
- Construction Begins on Ghana's $12 Billion Petroleum Hub, But Not Without Doubts
- Missouri Loses Control Over 1.5 Million-Mile Gas Pipeline Network as Feds Step In
- Panama Canal Considers Pipeline to Move U.S. Gas to Asia
- Gazprom’s Grandeur Fades as Europe Moves Away from Russian Gas
Pipeline Project Spotlight
Owner:
East African Crude Oil Pipeline Company
Project:
East African Crude Oil Pipeline (EACOP)
Type:
TotalEnergies in discussions with a Chinese company after Russian supplier Chelpipe was hit by sanctions.
Length:
902 miles (1,443 km)
Capacity:
200,000 b/d
Start:
2022
Completion:
2025
Comments