Feature
January 2009 Vol. 236 No. 1
Fast Fusion Speeds Gas Pipeline Construction
Pacific Tank & Pipeline installed a 16-mile, 16-inch gas pipeline and two 12-inch gas pipelines in Wagner, OK for Houston-based Coronado Energy E&P Company, L.L.C.