Feature
February 2025, Vol. 252, No. 2
HDD Bore Required Innovation, Re-Design
Among several different contracts for the Waukesha, Wisconsin, 36-mile pipeline and stations, one included 8.5 miles of water supply pipeline, with three horizontal directional drilling and eight tunnel crossings.