1. Home
  2. Magazine
  3. 2025
  4. February 2025, Vol. 252, No. 2
  5. HDD Bore Required Innovation, Re-Design
Feature February 2025, Vol. 252, No. 2

HDD Bore Required Innovation, Re-Design

Among several different contracts for the Waukesha, Wisconsin, 36-mile pipeline and stations, one included 8.5 miles of water supply pipeline, with three horizontal directional drilling and eight tunnel crossings.

This is a preview of our premium content.

Thank you for your interest—please log in or subscribe to read the full article.