1. Home
  2. Magazine
  3. 2024
  4. April 2024, Vol. 251, No. 4
  5. ABL Completes German Subsea Pipeline Installation Project
Feature April 2024, Vol. 251, No. 4

ABL Completes German Subsea Pipeline Installation Project

(P&GJ) — Energy consultancy ABL finalized its marine warranty survey scope in connection with the installation of Germany’s OAL subsea pipeline, with the first gas feed-in expected shortly.

This is a preview of our premium content.

Thank you for your interest—please log in or subscribe to read the full article.