1. Home
  2. Magazine
  3. 2023
  4. April 2023, Vol. 250, No. 4
  5. Tech Notes: Unpiggable In-Line Inspection Completed in South America
Feature April 2023, Vol. 250, No. 4

Tech Notes: Unpiggable In-Line Inspection Completed in South America

(P&GJ) — A team of Dexon pipeline engineers recently completed the inspection of a 20-mile (32-km), 3-inch diameter unpiggable or “challenging” underground petrochemical distribution pipeline, running from an onshore processing facility to a port on the South American coast.

This is a preview of our premium content.

Thank you for your interest—please log in or subscribe to read the full article.