Feature
April 2023, Vol. 250, No. 4
Tech Notes: Unpiggable In-Line Inspection Completed in South America
(P&GJ) — A team of Dexon pipeline engineers recently completed the inspection of a 20-mile (32-km), 3-inch diameter unpiggable or “challenging” underground petrochemical distribution pipeline, running from an onshore processing facility to a port on the South American coast.