Feature
December 2021, Vol. 248, No. 12
More Transnational Oil Capacity Could Reduce Rail Shipments
The Enbridge Line 3 replacement pipeline, which delivers crude oil from Edmonton, Alberta, Canada, to Superior, Wisconsin, became fully operational on Oct. 1, increasing the pipeline’s capacity to 760,000 bpd. Before the replacement, Enbridge Line 3 had a capacity of about half that amount.