1. Home
  2. Magazine
  3. 2015
  4. November 2015, Vol. 242, No. 11
  5. UTEC Completes Challenging Project in Cook Inlet
Feature November 2015, Vol. 242, No. 11

UTEC Completes Challenging Project in Cook Inlet

UTEC Survey was recently hired to provide a positioning solution for the installation of a monopod liquid natural gas platform and 30-km, 10-inch LNG pipeline for a major operation located in Alaska’s Cook Inlet. Twenty-four field personnel were mobilized and engaged with Coda Octopus Products for use of their Echoscope technology to provide positioning and survey services for five vessels.

This is a preview of our premium content.

Thank you for your interest—please log in or subscribe to read the full article.