Feature
September 2013, Vol. 240 No. 9
Inter To Build Lateral On Cold Lake Pipeline
Inter Pipeline Fund has entered into a binding agreement with Canexus Corp. to transport bitumen blend to Canexus unit train rail loading operations near Bruderheim, Alberta. Under the terms of the 10-year agreement, Inter Pipeline will provide Canexus with 100,000 bpd of firm capacity on a new pipeline lateral from the Cold Lake Pipeline system.