Feature
October 2013, Vol. 240 No. 10
ABB System Connects North Africas Largest Gas Producer To Europe
The Medgaz gas pipeline started delivering natural gas in March 2011 from the gas compressor station on the Algerian coast to the receiving terminal in Spain.