Feature
June 2013, Vol. 240, No. 6
Lithuania LNG Terminal Plan Delayed
Lithuanian state-controlled energy terminal operator Klaipedos Nafta delayed approval of a contractor to build a link to connect its planned LNG terminal to the distribution grid pending a probe of the tender terms. This could hold back launch of the gas platform in late 2014.