Feature
January 2013, Vol. 240 No. 1
Caspian Pipeline Consortium Upgrades Tengiz-Novorossiysk Pipeline
The Caspian Pipeline Consortium’s (CPS) 1,511-km Tengiz-Novorossiysk Pipeline was shut down for 72 hours to tie-in new equipment and replace block valves in an effort to increase the pipeline’s capacity.