1. Home
  2. Magazine
  3. 2012
  4. May 2012, Vol. 239 No. 5
  5. Technip To Install Pipeline In China Sea
Feature May 2012, Vol. 239 No. 5

Technip To Install Pipeline In China Sea

Offshore Oil Engineering Co. has awarded Technip a pipeline installation contract for the Liwan 3-1 shallow water project, located in the Pearl River Mouth Basin, China Sea. With a length of 160 miles, the pipeline will link the Liwan gas platform to China National Offshore Oil Corporation's Gaolan gas plant.

This is a preview of our premium content.

Thank you for your interest—please log in or subscribe to read the full article.