Feature
October 2009 Vol. 236 No. 10
First Subsea Supplies STP Buoy Mooring And Pull-in Connectors for Peregrino FPSO
The Peregrino STP buoy will be moored in 100 m of water, 85 km offshore Brazil. First Subsea is providing 10 Ballgrab ball and taper connectors with a minimum breaking load of 10,600 kN for its 30-year life.