1. Home
  2. Magazine
  3. 2009
  4. May 2009 Vol. 236 No. 5
  5. On-Board Pipeline Installation And Fatigue Monitoring System
Feature May 2009 Vol. 236 No. 5

On-Board Pipeline Installation And Fatigue Monitoring System

As subsea pipeline developments continue to move into deep and ultra-deep water locations, there is an increasing need for the accurate prediction of expected pipeline fatigue life. A significant factor that must be considered as part of this process is the accumulated fatigue damage experienced by a pipeline weld during installation, i.e. before commencement of operations.

This is a preview of our premium content.

Thank you for your interest—please log in or subscribe to read the full article.