ONEOK Pipeline Expansion Projects, NGL Fractionator Completed
ONEOK Inc., completed the MB-6, a 125,000-bpd NGL fractionator in Mont Belvieu, Texas, and the full looping of the West Texas NGL Pipeline system.
ONEOK Inc., completed the MB-6, a 125,000-bpd NGL fractionator in Mont Belvieu, Texas, and the full looping of the West Texas NGL Pipeline system.
As Enterprise Products Partners LP expands its footprint in the Permian Basin, the conversion of existing pipelines raises both opportunities and challenges. This article delves into the complexities involved in repurposing energy infrastructure, highlighting technical, economic, and safety considerations amid robust production growth.
(P&GJ) — ASME B31.8, ASME B31.4, and CSA Z662 have well-deserved international reputations as best-in-class, evidenced by their frequent reference by documents within other jurisdictions. However, the standards don't contain explicit requirements to address the design, construction and operational challenges presented by transporting gaseous hydrogen at transmission pressures.
As crude oil demand and storage availability hit bottom, there are signs of hope for natural gas.
When examining the global liquefied natural gas (LNG) trade, including the role of U.S. midstream infrastructure, there are various exogenous factors that can be part of the matrix.
Saudi Aramco has signed a 20-year agreement to buy LNG from an export terminal that U.S.-based Sempra Energy is developing on the Texas Gulf Coast.
At least a small measure of celebration likely buzzed through the offices at Shell Pipeline Company when FERC granted a declaratory order for its Falcon Ethane Pipeline System. The 98-mile pipeline is fundamental to the success the company’s $6 billion ethane cracker plant under construction in Pennsylvania.
The upstream sector started the new year on a cautious note following a sharp decline in oil and gas prices, but the midstream sector roared into 2019 on a wave of pipeline construction activity. The latest Pipeline & Gas Journal survey indicates 145,353 miles of pipelines were planned or under construction worldwide at the start of the year.
Global energy trends and forecasts entering the second half of 2018 continue to support a generally bullish outlook for oil and gas production and infrastructure construction to meet growing demand and evolving patterns of interregional trade.
A “new energy realism” based on advancing technologies is replacing “old energy pessimism” as government and industry leaders collaborate on future energy infrastructure.
The Marcellus-Utica has an estimated quadrillion cubic feet of natural gas, but markets and infrastructure must be developed to leverage this potential.
You can change it with picker below or later using the switch located in the footer.