1. Home
  2. Magazine
  3. 2019
  4. November 2019, Vol. 246, No. 11
  5. Allseas Installs Real-Time Pipelogger for Major Subsea Pipeline Project
Feature November 2019, Vol. 246, No. 11

Allseas Installs Real-Time Pipelogger for Major Subsea Pipeline Project

Allseas installed WFS Technologies’ new Seatooth Pipelogger for the real-time measurement of process temperature on a subsea pipeline system. The pipeline system is designed to have a total gas throughput capacity of 31.5 Bcm per year.

This is a preview of our premium content.

Thank you for your interest—please log in or subscribe to read the full article.