1. Home
  2. Topics
  3. Gathering

Gathering

NEWS 01/11/2023

Opero Energy Wins Gas-Treating Contract for NG3 Development in Haynesville Basin

(P&GJ) — With 4,000 miles of pipeline and seven processing plants, Momentum Midstream’s New Generation Gas Gathering (NG3) project in the Haynesville Shale will have an initial treating capacity of 1.7 Bcf/d, expandable to 2.2 Bcf/d, and will also include a carbon capture and sequestration component.

NEWS 12/05/2022

Bison Water Midstream Gains Oklahoma Infrastructure with Lagoon, Overflow Energy Deal

(P&GJ) — Through the acquisition, Bison's integrated water infrastructure platform is now comprised of a 750-mile water gathering system, 60 disposal facilities, 5.7 million barrels of storage capacity, 100,000 barrels per day of recycling/reuse capacity, and over 20 long-term contracts covering 17 million dedicated AMI acres across the entire Basin.

NEWS 12/05/2022

Outrigger Energy Sells Nearly 200 Miles of Natural Gas, Crude Pipeline to Summit Midstream

(P&GJ) — Outrigger Energy II LLC has completed the sale of its midstream system in Weld County, Colorado to Summit Midstream Partners LP, which includes approximately 160 miles of low and high pressure natural gas gathering pipeline and 30 miles of crude oil gathering pipelines with delivery to the Pony Express Pipeline.

NEWS 10/12/2022

Clearfork Midstream Expanding Haynesville Gathering System with Two New Pipelines

(P&GJ) — Clearfork is expanding the footprint of its Holly System by constructing a 24-inch diameter pipeline to the east side of the Red River in northeast Red River Parish, Louisiana as well as a 16-inch diameter pipeline that will expand Clearfork’s capacity in the Spring Ridge area in Caddo Parish, Louisiana.

NEWS 09/01/2022

Palisade Pipeline Launches Open Season for Permian Basin Produced Water Gathering Pipeline

The pipeline system consists of 97 miles of easements and has been approved to move 500,000 bbl/day of produced water that run from Lovington, New Mexico south to Monahans, Texas. Currently, the Rail Runner project has 150,000 bbl/day of available disposal volume with plans to expand that capacity up to 500,000 bbl/day.