Whitepapers

A quick look at the major causes of midstream pipeline incidents in 2018 reveals an interesting picture. While material/weld/equipment failures accounted for more than 35% of incidents, the major cause for 11.7% of incidents was incorrect operation measures. These figures rightly underline the importance of establishing and maintaining a strong operator qualification (OQ) and safety orientation program for workers. This white paper will discuss:
• The current landscape of pipeline operations
• Regulations and qualifications to know
• How to orchestrate a successful OQ program.
Download Whitepaper
Yokogawa's AI empowers customers with an advanced understanding of their current situation, allowing them to correctly predict future events and adapt accordingly. Learn how intelligent sensing and advanced analytics can help you make decisions to avoid problems and improve your business. Unplanned events can cost hundreds of thousands of dollars per day. You can avoid this and Yokogawa can help. Download this free e-book to learn more.
Download Whitepaper
High-Density Polyethelene (HDPE) has grown considerably in popularity in recent years. As operators seek new ways to cut costs, HDPE offers a number of advantages over steel. It is relatively inexpensive, flexible, lightweight, and far easier to install. However, it does have one major shortcoming. HDPE is vulnerable to chemical permeation. Most companies and operators are aware of permeation, but there is less information readily available on how to address the problem. Our upcoming whitepaper discusses what chemical permeation is, why it’s a problem for HDPE specifically, the risks involved and commercially available solutions.
Download Whitepaper
NDT Global's Evo Eclipse technology is a combination of high-resolution crack robots (UCx) and new analysis methodologies. Together, these technologies enable new inline inspection robots with a circumferential resolution of 5.0 mm (0.2 in). Higher-resolution tools, specialized sensors and measurement configurations address major flaw-measurement challenges: depth-sizing accuracies, extended maximum crack depth sizing beyond the formerly known maximum crack depth of typically 4 mm (0.16 in), through wall defects, and measurement capabilities less susceptible to skew and tilt.
Download Whitepaper
Hydrocarbon processing plants often focus on purchasing a GC that can handle the gas analysis application at the best price and only consider the cost of the GC. This approach ignores significant expenses required for the installation and operation of the GC. Learn about the hidden costs in GC installations and steps you can take to avoid them.
Download Whitepaper
Shawcor, a Canada-based energy services company, faced the challenge of needing to create an automated, custom handling machine to load and unload large glass reinforcement tape pads. The cost and long lead times needed to make the custom parts for the machine was unreasonable, so they had to explore other options. Read on to see how Shawcor leveraged carbon fiber 3D printing to replace aluminum and sheet metal parts, while saving $27,000 CAD with 53 unique 3D printed parts.
Download Whitepaper

See how upgrading your Flowsic600 "Classic" ultrasonic meters to the new XT Gateway head will give you increased I/O, no impact on metrology, no recalibration and lengthen your meters service life.
Download Whitepaper
Some pipelines cannot be thoroughly inspected or maintained, using standard operational pigs or In Line Inspection tools. This is counterproductive and may even be a pipeline safety and integrity non-compliance issue.
This paper discusses a case study where DNV GL type approved, double block and bleed isolation technology, has been utilized to safely retrofit pigging facilities in a live pipeline system without affecting production.
Download Whitepaper
- Energy Transfer Wins New York Court Ruling in $150 Million Pipeline Fraud Case
- $3 Billion Natural Gas Pipeline Expansion to Add 1.3 Bcf Capacity in Southeast Region
- Trump Puts Keystone XL Pipeline Back in Discussion, Though Revival Faces Developer Resistance
- Boardwalk Approves 110-Mile, 1.16 Bcf/d Mississippi Kosci Junction Pipeline Project
- Kinder Morgan Approves $1.4 Billion Mississippi Crossing Project to Boost Southeast Gas Supply
- Enbridge Should Rethink Old, Troubled Line 5 Pipeline, IEEFA Says
- GOP Lawmakers Slam New York for Blocking $500 Million Pipeline Project
- Texas Oil Company Challenges $250 Million Insurance Collateral Demand for Pipeline, Offshore Operations
- Phillips 66 to Sell $865 Million Stake in 500-Mile Gulf Coast Express Pipeline to ArcLight
- NDT, Aramco to Launch 56-Inch Inspection Tool