BP Delivers First Gas from Trinidad's Mento Field
bp Trinidad and Tobago (bpTT) announced today that the Mento development has safely delivered first gas through connection of the initial discovery well and the drilling campaign for the remaining seven gross wells on the platform will now begin.
Mento is a 50/50 joint venture between EOG Resources Trinidad Ltd (EOG) and bpTT, with EOG as the operator. The development features a 12-slot, attended facility that is located in acreage jointly licensed by bpTT and EOG off Trinidad’s southeast coast.
Mento is one of bp’s 10 major projects expected to start up worldwide between 2025 and 2027 that bp announced earlier this year as part of its strategy to grow the upstream. Production from Mento will make a significant contribution towards the 250,000 barrels of oil equivalent per day (boed) combined peak net production expected from these 10 projects.
The Mento platform was built at the TOFCO fabrication yard, La Brea, Trinidad.
“For bpTT, this represents our second start up this year and it is tangible proof of the benefits of partnering with others to bring much needed gas into production," said bpTT president David Campbell. "The bpTT/EOG partnership is progressing well as we continue to work on our next joint venture project Coconut.”
bpTT and EOG are currently working on the Coconut gas development under a similar joint venture arrangement. Start-up is expected in 2027
Related News
Related News

- Kinder Morgan Proposes 290-Mile Gas Pipeline Expansion Spanning Three States
- Enbridge Plans 86-Mile Pipeline Expansion, Bringing 850 Workers to Northern B.C.
- Intensity, Rainbow Energy to Build 344-Mile Gas Pipeline Across North Dakota
- Tallgrass to Build New Permian-to-Rockies Pipeline, Targets 2028 Startup with 2.4 Bcf Capacity
- U.S. Moves to Block Enterprise Products’ Exports to China Over Security Risk
- U.S. Pipeline Expansion to Add 99 Bcf/d, Mostly for LNG Export, Report Finds
- A Systematic Approach To Ensuring Pipeline Integrity
- 275-Mile Texas-to-Oklahoma Gas Pipeline Enters Open Season
- TC Energy’s North Baja Pipeline Expansion Brings Mexico Closer to LNG Exports
- Consumers Energy Begins 135-Mile Michigan Gas Pipeline Upgrade, Taps 600 Workers
Comments