Exxon to Increase Gas Production, Transport from Hammerhead Project, Offshore Guyana
(Reuters) – A consortium led by U.S. major Exxon Mobil plans to produce up to 180,000 barrels per day (bpd) of oil and 95 million cubic feet per day (mmcfd) of gas at its seventh project in Guyana, Hammerhead, according to a document published by the country's environmental agency on Monday.

The Exxon group, in which Hess and CNOOC also participate, has waited for the government's green light for the project since last year. It also recently requested approval for its eighth project, Longtail, the company said last week.
Hammerhead will involve the drilling of between 14 and 30 development wells, the deployment of a Floating Production, Storage and Offloading vessel (FPSO) and the construction of a 13-kilometer gas pipeline that will connect into the country's flagship Gas-to-Energy project, Exxon said in its application for environmental authorization.
"While much of the installation and production operations activity will be offshore, the project will also use onshore infrastructure operated by third parties, including, but not limited to, shore bases and waste management facilities in Guyana," it added.
Guyana has been pressing Exxon to produce and deliver more natural gas, part of the government's strategy to rely on the fuel for power generation, to industrialize the country and begin petrochemical and liquefied natural gas (LNG) businesses that can expand revenue.
Following gas from the Liza project expected this year, Hammerhead would increase Exxon's gas supply to Guyana's shore.
The group must submit a field development plan to have the project fully approved.
Related News
Related News

- Trump Puts Keystone XL Pipeline Back in Discussion, Though Revival Faces Developer Resistance
- Army Corps Lists Enbridge’s Line 5 as ‘Emergency’ Project Eligible to Bypass Environmental Review
- Missouri Loses Control Over 1.5 Million-Mile Gas Pipeline Network as Feds Step In
- Energy Transfer Wins New York Court Ruling in $150 Million Pipeline Fraud Case
- ONEOK, MPLX to Build $1.4 Billion LPG Export Terminal, Pipeline in Texas
- Army Corps Lists Enbridge’s Line 5 as ‘Emergency’ Project Eligible to Bypass Environmental Review
- Kinder Morgan Approves $1.4 Billion Mississippi Crossing Project to Boost Southeast Gas Supply
- India’s GAIL Eyes U.S. LNG Deals Following Trump’s Policy Shift
- TC Energy Beats Q4 Profit Estimates, Driven by Mexico Pipelines' Success
- Enbridge Should Rethink Old, Troubled Line 5 Pipeline, IEEFA Says
Comments