Morocco to Tender for Floating LNG Terminal at Nador West Med Port, Official Says
(Reuters) — Morocco plans to launch a tender this summer to build a floating liquefied natural gas (LNG) terminal in the northeastern Nador West Med port, the energy ministry's head of oil and gas said on Friday.
The ministry expects to reach financial close in 2025 with construction, commissioning and commercial operations due in 2026, Abdelghafour El Hadjaoui said in a presentation seen by Reuters.
The LNG terminal will be connected to an existing pipeline that helps Morocco import 0.5 billion cubic meters (Bcm) of LNG annually from Spanish terminals, enough to power two small electricity production plants.
Morocco also plans to connect the same pipeline to developing gas fields in its east and west. Morocco's natural gas needs are expected to increase to 8 Bcm in 2027 from 1 Bcm currently, according to ministry estimates.
Nador West Med is a deepwater port under construction with expected capacity of 3.5 million containers.
Related News
Related News
- Texas Waha Hub Gas Prices Plunge to Record Lows, Hit Negative Territory
- U.S. Appeals Court Strikes Down Controversial Biden Pipeline Safety Rules
- Texas Oil Pipelines Near Max Capacity, Threatening Future Export Limits
- Williams Seeks Emergency Certificate to Operate $1 Billion Mid-Atlantic Gas Pipeline After Court Reversal
- U.S. Court Overturns FERC Approval for NextDecade’s $18 Billion Rio Grande LNG Project
- Saudi Arabia Looking to Expand Pipeline to Reduce Oil Exports via Gulf
- Report: Houston Region Poised to Become a Global Clean Hydrogen Hub
- Texas Startup Endeavors Again to Build First Major U.S. Oil Refinery Since 1977
- Puerto Bahia, Gasco to Build Liquefied Petroleum Gas Facility in Cartagena, Colombia
- Sempra's Costa Azul LNG Project Delayed by Labor Issues
Comments