Berkshire Hathaway Maryland Cove Point LNG Plant Shut for Annual Maintenance
(Reuters) — Berkshire Hathaway Energy's Cove Point LNG export plant in Maryland shut on Saturday for annual maintenance that is expected to last about three weeks, according to analysts and pipeline data.
Data provider Refinitiv said the amount of gas flowing to the plant dropped to near zero on Saturday from an average of 0.76 billion cubic feet per day (Bcf/d) over the prior month.
Cove Point and other U.S. LNG export plants shut in the spring and autumn when global demand for gas for heating or cooling is lower than during the peak winter and summer months.
Cove Point usually shuts in the autumn. The plant shut from Sept. 20-Oct. 11 in 2021, according to Refinitiv data.
Cove Point is designed to liquefy about 0.75 Bcf/d of gas into LNG.
One billion cubic feet is enough to supply about 5 million U.S. homes for a day.
Berkshire Hathaway Inc.'s Berkshire Hathaway Energy operates Cove Point and owns 25% of the facility. The rest is owned by units of Dominion Energy Inc. (50%) and Brookfield Asset Management Inc. (25%).
When Dominion operated the plant, it sold the project's capacity for 20 years to a subsidiary of GAIL (India) Ltd. and to ST Cove Point, which is a joint venture between units of Japanese trading company Sumitomo Corp. and Tokyo Gas Co. Ltd.
Related News
Related News

- Kazakh Oil Decouples from Russian Crude But Risk Weighs on Price
- Pipeline Operator TC Energy Says Stress, Weld Fault Caused Keystone Oil Spill
- Repsol Ditches Plans to Develop LNG Terminal on Canada’s East Coast
- US to Sell 26 Million Barrels of Oil Reserves As Mandated by Congress
- Ukraine to Jointly Buy Gas with European Union Countries
- US Intelligence Suggests Pro-Ukrainian Group Sabotaged Nord Stream Pipelines -NYT
- EIA: US Natural Gas Output to Hit Record High in 2023, Demand to Fall
- US Regulator Orders Lower Pressure on Keystone Pipeline System After Spill
- US Carbon Pipeline Faces Setback as Residents Refuse to Cede Land Rights
- YPF CEO: Green Light for Argentina's Gas Project with Petronas to Come in 2024
Comments