Germany Plans to Build Fifth Floating LNG Terminal by Year End
(Reuters) — A fifth floating LNG terminal will be built in Germany by a private consortium, in addition to the four already planned by the government, the country's economy ministry said on Tuesday.
The fifth terminal, to be located in Lubmin, about 250 km (155 miles) north of Berlin, should be built by the end of this year, according to the ministry.
Lubmin and Stade, near Hamburg, were also announced by the ministry on Tuesday as the sites of two of the planned government terminals.
Those sites, part of Germany's strategy to wean itself off Russian energy as quickly as possible, are in addition to two in Wilhelmshaven and Brunsbuettel that were already announced.
The floating terminals are essentially liquefied gas tankers that can return the fuel to its gas state themselves, which means a complete port is not required.
Wilhelmshaven and Brunsbuettel, both located northwest of Bremen, are scheduled to go into operation as early as this winter.
The terminals in Stade and Lubmin will not be ready for operation until the end of 2023 at the earliest, according to the ministry.
Related News
Related News

- Army Corps Lists Enbridge’s Line 5 as ‘Emergency’ Project Eligible to Bypass Environmental Review
- Missouri Loses Control Over 1.5 Million-Mile Gas Pipeline Network as Feds Step In
- 1,000-Mile Pipeline Exit Plan by Hope Gas Alarms West Virginia Producers
- Greenpeace Ordered to Pay $667 Million to Energy Transfer Over Dakota Access Pipeline Protests
- Canada’s Canceled Oil Pipelines: The Projects That Didn’t Make It
- Army Corps Lists Enbridge’s Line 5 as ‘Emergency’ Project Eligible to Bypass Environmental Review
- Michigan Court Backs Permits for Enbridge’s Line 5 Pipeline Tunnel Project
- Editor’s Notebook: Fire Fuels Pipeline Concerns
- Missouri Loses Control Over 1.5 Million-Mile Gas Pipeline Network as Feds Step In
- Enbridge Plans $2 Billion Upgrade for North America’s Largest Crude Pipeline
Comments