Greece's Gastrade Says LNG Terminal on Track with Final Investment Decision
ATHENS (Reuters) — Greece's Gastrade said on Friday a final investment decision had been made on developing a Greek liquefied natural gas (LNG) terminal, the last step before building the project begins.
Gastrade is developing a floating LNG facility off the northern city of Alexandroupolis, with an annual capacity of about 5 billion cubic meters of gas.
The Copelouzos family, GasLog Cyprus Investments, Greek gas utility DEPA Commercial, Greek gas grid operator DESFA and Bulgartransgaz all have stakes in the project, which is expected to start operating by the end of 2023.
Gastrade said in a statement that the shareholders have unanimously approved that all requirements for the project have been secured and it is on track.
The facility will be linked to the Greek gas grid via a 28-kilometre pipeline and carry gas on to Bulgaria and North Macedonia as part of Greece's drive to diversify its gas resources and become an energy hub in southeastern Europe
Related News
Related News
- Keystone Oil Pipeline Resumes Operations After Temporary Shutdown
- Freeport LNG Plant Runs Near Zero Consumption for Fifth Day
- Biden Administration Buys Oil for Emergency Reserve Above Target Price
- Mexico Seizes Air Liquide's Hydrogen Plant at Pemex Refinery
- Enbridge to Invest $500 Million in Pipeline Assets, Including Expansion of 850-Mile Gray Oak Pipeline
- Enbridge Receives Approval to Begin Service on Louisiana Venice Gas Pipeline Project
- U.S. to Acquire 3 Million Barrels of Oil for Emergency Reserve in September
- AG&P LNG Acquires 49% Stake in Vietnam's Cai Mep LNG Terminal
- BP's Carbon Emissions Increase in 2023, Ending Decline Since 2019
- Texas Sues EPA Over Methane Emission Rules for Oil and Gas Sector
Comments