NGL Energy Partners Announces Commissioning of Poker Lake Express Pipeline
(P&GJ) — NGL Energy Partners has begun receiving produced water from XTO Energy’s Poker Lake Development in the Delaware Basin.
These volumes represent full commissioning of NGL’s 30-inch pipeline, Poker Lake Express, which has been constructed to transport volumes associated with its 18-year Poker Lake acreage dedication.
This dedication includes first-call rights for produced water covering approximately 70,000 contiguous acres in Eddy County, NM.
The Partnership is utilizing the new Poker Lake Express Pipeline, which has an initial capacity of over 350,000 barrels per day and connects into its integrated Delaware Basin produced water pipeline infrastructure network.
The Partnership expects to expand its takeaway capacity with an additional pipeline as the Poker Lake Development progresses, ultimately increasing total takeaway capacity to over 700,000 barrels per day from this development.
“We are pleased to announce first flows from Poker Lake, which represents a major milestone for our Water Solutions business,” said Christian Holcomb, Senior Vice President and Chief Operating Officer, NGL Water Solutions.
NGL owns and operates the largest integrated network of large diameter produced water pipelines, recycling facilities and disposal wells in the Delaware Basin.
Related News
Related News
- Texas Waha Hub Gas Prices Plunge to Record Lows, Hit Negative Territory
- U.S. Appeals Court Strikes Down Controversial Biden Pipeline Safety Rules
- Williams Seeks Emergency Certificate to Operate $1 Billion Mid-Atlantic Gas Pipeline After Court Reversal
- Texas Oil Pipelines Near Max Capacity, Threatening Future Export Limits
- Energy Transfer Subsidiary Selects KTJV for Lake Charles LNG Export Project
- Saudi Arabia Looking to Expand Pipeline to Reduce Oil Exports via Gulf
- Report: Houston Region Poised to Become a Global Clean Hydrogen Hub
- Texas Startup Endeavors Again to Build First Major U.S. Oil Refinery Since 1977
- Puerto Bahia, Gasco to Build Liquefied Petroleum Gas Facility in Cartagena, Colombia
- Ukraine Approves $20 Billion Plan to Boost Renewable Energy to 27% by 2030
Comments