March 2022, Vol. 249, No. 3
Tech Notes
Pipeline Solutions to Withstand Harsh Temperatures
Special to P&GJ Since beginning commercial operation in January 2018, the second line of the China-Russia crude oil pipeline has doubled the yearly annual imports of crude oil from Russia to China from 15 million to 30 million tons. The pipeline, which measures over 528 miles (800 km) and was constructed in a record 180 days, is exposed to extreme conditions. To ensure accurate pipeline monitoring and control even in severe environments, remote telemetry specialist Ovarro provided 22 TBox-MS Modular remote telemetry units (RTUs). The pipeline transports millions of tons of Russian crude oil into China annually, and construction of the second line of the China-Russia crude oil

Comments