July 2015, Vol. 242, No. 7

Projects

BP Selects Technip for Thunder Horse South Expansion in Gulf

BP Exploration & Production awarded Technip a lump sum project for the design, engineering, fabrication, installation and pre-commissioning of the new production pipeline systems on the south side of the Thunder Horse production drilling quarters unit. At a water depth of 1,900 meters, the field development is located in Mississippi Canyon Blocks 778 and 822, in the ultra-deepwater Gulf of Mexico environment. The contract covers project management and engineering, Coating, fabrication, installation and permanent anchoring of two rigid production flowlines of 3.25-km each with four pipeline end terminations, and pre-commissioning and testing. Technip’s operating center in Hou

Log in to view this article.

Not Yet A Subscriber? Here are Your Options.

1) Start a FREE TRIAL SUBSCRIPTION and gain access to all articles in the current issue of Pipeline & Gas Journal magazine.

2) Start your full access subscription to Pipeline & Gas Journal and gain UNLIMITED access to this article, the current issue, all past issues in the technical archive, access to all special reports, special focus supplements and more. Pricing start at $395/year.   

*Access will be granted the next business day.

 

Comments

{{ error }}
{{ comment.comment.Name }} • {{ comment.timeAgo }}
{{ comment.comment.Text }}