July 2015, Vol. 242, No. 7

Projects

BP Selects Technip for Thunder Horse South Expansion in Gulf

BP Exploration & Production awarded Technip a lump sum project for the design, engineering, fabrication, installation and pre-commissioning of the new production pipeline systems on the south side of the Thunder Horse production drilling quarters unit. At a water depth of 1,900 meters, the field development is located in Mississippi Canyon Blocks 778 and 822, in the ultra-deepwater Gulf of Mexico environment. The contract covers project management and engineering, Coating, fabrication, installation and permanent anchoring of two rigid production flowlines of 3.25-km each with four pipeline end terminations, and pre-commissioning and testing. Technip’s operating center in Hou

Log in to view this article.

Not Yet A Subscriber? Here are Your Options.

1) Start a FREE TRIAL SUBSCRIPTION and gain access to all articles in the current issue of Pipeline & Gas Journal magazine.

2) SUBSCRIBE to Pipeline & Gas Journal magazine in print or digital format and gain ACCESS to the current issue as well as to 3 articles from the PGJ archives per month. $199 for an annual subscription*.

3) Start a FULL ACCESS PLAN SUBSCRIPTION and regain ACCESS to this article, the current issue, all past issues in the PGJ Archive, access to all special reports, special focus supplements and more. $1,395 for an annual subscription.  For information about group rates or multi-year terms, contact J'Nette Davis-Nichols at Jnette.Davis-Nichols@GulfEnergyInfo.com or +1 713.520.4426*.

 

 

*Access will be granted the next business day.

Comments

{{ error }}
{{ comment.comment.Name }} • {{ comment.timeAgo }}
{{ comment.comment.Text }}