February 2015, Vol. 242, No. 2

Projects

SENER Consortium Delivers Compressor Stations For Mexico Transport System

SENER, in consortium with the company Bonatti, has delivered two compression stations that comprise the Los Ramones 1 Transport System in Mexico to Gasoductos del Noreste. This concludes the first phase of the turnkey project – the engineering, procurement, construction and commissioning of two compression stations in Ciudad Camargo (in the state of Tamaulipas, on the border with the U.S.) and Los Ramones (in the state of Nueva León, near Monterrey), respectively. SENER also carried out the detailed engineering of the 116-km, 48-inch gas pipeline constructed by Bonatti. Each compression station has its own control system which will be connected via satellite to th

Log in to view this article.

Not Yet A Subscriber? Here are Your Options.

1) Start a FREE TRIAL SUBSCRIPTION and gain access to all articles in the current issue of Pipeline & Gas Journal magazine.

2) SUBSCRIBE to Pipeline & Gas Journal magazine in print or digital format and gain ACCESS to the current issue as well as to 3 articles from the PGJ archives per month. $199 for an annual subscription*.

3) Start a FULL ACCESS PLAN SUBSCRIPTION and regain ACCESS to this article, the current issue, all past issues in the PGJ Archive, access to all special reports, special focus supplements and more. $1,395 for an annual subscription.  For information about group rates or multi-year terms, contact J'Nette Davis-Nichols at Jnette.Davis-Nichols@GulfEnergyInfo.com or +1 713.520.4426*.

 

 

*Access will be granted the next business day.

Related Articles

Comments

{{ error }}
{{ comment.comment.Name }} • {{ comment.timeAgo }}
{{ comment.comment.Text }}