October 2014, Vol. 241, No. 10

Projects

GateTerminal Simultaneously Reloads Two LNG Carriers

For the first time in its history the Gate terminal, located on the Maasvlakte in Rotterdam, The Netherlands, simultaneously reloaded the Wilgas and Coral Methane LNG carriers with LNG. Reloading of LNG at the terminal started in 2013 following modifications to the existing jetties to accommodate smaller ships. Since then, Gate has carried out 16 operations for these types of vessels. The Gate terminal, a joint venture of Gasunie and Vopak, began operations in September 2011 and has contributed to diversifying the European gas supply by providing access to LNG originating from countries around the world. At Gate, LNG is received, stored, regasified and then fed into the Northw

Log in to view this article.

Not Yet A Subscriber? Here are Your Options.

1) Start a FREE TRIAL SUBSCRIPTION and gain access to all articles in the current issue of Pipeline & Gas Journal magazine.

2) Start your full access subscription to Pipeline & Gas Journal and gain UNLIMITED access to this article, the current issue, all past issues in the technical archive, access to all special reports, special focus supplements and more. Pricing start at $395/year.   

*Access will be granted the next business day.

 

Related Articles

Comments

{{ error }}
{{ comment.comment.Name }} • {{ comment.timeAgo }}
{{ comment.comment.Text }}