September 2011, Vol. 238 No. 9

Features

HDD Solves Crude Line Replacement Across St. Clair River

Enbridge sprang into action after confirming a minor anomaly on its 30-inch Line 6B crude oil pipeline where it crosses under the St. Clair River spanning from Marysville, MI to St. Clair Township, Ontario. After lowering the operating pressure and completing a comprehensive engineering evaluation, Enbridge submitted a written technical and engineering assessment report to United States pipeline safety regulators in September 2010. In a Corrective Action Order issued by the Pipeline and Hazardous Materials Safety Administration (PHMSA) on September 17, 2010, Enbridge was to “…include project plans and a schedule for total replacement of the pipe in the entire St. Cla

Log in to view this article.

Not Yet A Subscriber? Here are Your Options.

1) Start a FREE TRIAL SUBSCRIPTION and gain access to all articles in the current issue of Pipeline & Gas Journal magazine.

2) SUBSCRIBE to Pipeline & Gas Journal magazine in print or digital format and gain ACCESS to the current issue as well as to 3 articles from the PGJ archives per month. $199 for an annual subscription*.

3) Start a FULL ACCESS PLAN SUBSCRIPTION and regain ACCESS to this article, the current issue, all past issues in the PGJ Archive, access to all special reports, special focus supplements and more. $1,395 for an annual subscription.  For information about group rates or multi-year terms, contact J'Nette Davis-Nichols at Jnette.Davis-Nichols@GulfEnergyInfo.com or +1 713.520.4426*.

 

 

*Access will be granted the next business day.

Related Articles

Comments

{{ error }}
{{ comment.comment.Name }} • {{ comment.timeAgo }}
{{ comment.comment.Text }}