Red Butte Pipe Line Announces Open Season
(P&GJ) — Red Butte Pipe Line has announced an open season to solicit shipper commitments for the refurbishment and overhaul of a Wyoming pipeline.
The pipeline runs 8 miles between the Red Butte Gebo Station located in Hot Springs County, Wyoming to Chatham Station located in Washakie County, Wyoming.
Upon a showing of significant shipper interest, the Pipeline Project will be capable of providing up to 5,000 barrels per day of transportation service for petroleum meeting the Carrier’s common stream (API gravity between 30º and 50º, with an upper sulfur content limit of 0.42%).
The deadline for submitting bids in the open season is September 7, 2020 but may be extended at Carrier’s sole discretion.
Red Butte is a 495-mile crude oil pipeline system across the Big Horn and Wind River Basins.
Red Butte is currently the largest pipeline gathering asset transporting crude oil out of the Big Horn and Wind River Basins to Casper, Wyoming.
The system has two delivery points, multiple truck loading stations, and over 800,000 barrels of storage along the system.
For additional information, please visit www.scmidstream.com.
Related News
Related News
- Keystone Oil Pipeline Resumes Operations After Temporary Shutdown
- Biden Administration Buys Oil for Emergency Reserve Above Target Price
- Freeport LNG Plant Runs Near Zero Consumption for Fifth Day
- Enbridge to Invest $500 Million in Pipeline Assets, Including Expansion of 850-Mile Gray Oak Pipeline
- Mexico Seizes Air Liquide's Hydrogen Plant at Pemex Refinery
- Evacuation Technologies to Reduce Methane Releases During Pigging
- Editor’s Notebook: Nord Stream’s $20 Billion Question
- Enbridge Receives Approval to Begin Service on Louisiana Venice Gas Pipeline Project
- Mexico Seizes Air Liquide's Hydrogen Plant at Pemex Refinery
- Russian LNG Unfazed By U.S. Sanctions
Comments