Construction Begins on Oil Pipeline Project in Nigeria
1/16/2018
China Harbour Engineering Ltd. and Offshore Oil Engineering Co. Ltd. have started construction on a 100-kilometer subsea pipeline that will connect to Dangote Oil Refining Co. Ltd.’s new 650,000 bpd refinery being built in southwestern Nigeria’s Lekki Free Trade Zone.
The scope of work consists of the transportation and installation of six 24-inch pipelines and three 48-inch pipelines, along with five single point mooring systems, a catenary anchor leg mooring buoy, and a pipeline end manifold for a shuttle tanker that imports crude for the refinery.
The project is expected to be operational by September 2019.
Related News
Related News
Sign up to Receive Our Newsletter
- Keystone Oil Pipeline Resumes Operations After Temporary Shutdown
- U.S. House Passes Bill to Reverse Biden's LNG Pause
- Mexico Orders Seizure of Hydrogen Plant at Pemex Oil Refinery
- EnCap Eyes $5 Billion Sale of Bakken Shale Producer Grayson Mill
- Sunoco to Acquire NuStar Energy in $7.3 Billion Deal for Midstream Expansion
- U.S. Regulators Approve Mexico Pacific LNG's Saguaro Connector Pipeline
- U.S. to Acquire 3 Million Barrels of Oil for Emergency Reserve in September
- AG&P LNG Acquires 49% Stake in Vietnam's Cai Mep LNG Terminal
- BP's Carbon Emissions Increase in 2023, Ending Decline Since 2019
- Texas Sues EPA Over Methane Emission Rules for Oil and Gas Sector
Pipeline Project Spotlight
Owner:
East African Crude Oil Pipeline Company
Project:
East African Crude Oil Pipeline (EACOP)
Type:
TotalEnergies in discussions with a Chinese company after Russian supplier Chelpipe was hit by sanctions.
Length:
902 miles (1,443 km)
Capacity:
200,000 b/d
Start:
2022
Completion:
2025
Comments