MDU to Build Natural Gas Pipeline to Doosan Bobcat Factory
BISMARCK, N.D. (AP) — Bismarck-based Montana Dakota Utilities is building a $13.8 million pipeline to provide natural gas to a South Korea-owned manufacturing facility in southeastern North Dakota.
MDU says construction of the 12-inch, 21-mile long pipeline to the Doosan Bobcat Inc.’s factory in Gwinner will be complete in September 2018.
The North Dakota Industrial Commission earlier approved $10.5 million in financing through the state-owned Bank of North Dakota. Regulators also granted the project a certificate of public convenience and necessity, which means traditional permits aren’t necessary.
Doosan Bobcat signed a 15-year contract with MDU to get gas from the pipeline, which is fed Alliance Pipeline’s system that extends from western Canada to a Chicago hub.
North Dakota natural gas helps feed that pipeline at two points in the western part of the state.
Related News
Related News
- Keystone Oil Pipeline Resumes Operations After Temporary Shutdown
- U.S. House Passes Bill to Reverse Biden's LNG Pause
- Mexico Orders Seizure of Hydrogen Plant at Pemex Oil Refinery
- EnCap Eyes $5 Billion Sale of Bakken Shale Producer Grayson Mill
- Sunoco to Acquire NuStar Energy in $7.3 Billion Deal for Midstream Expansion
- U.S. Regulators Approve Mexico Pacific LNG's Saguaro Connector Pipeline
- U.S. to Acquire 3 Million Barrels of Oil for Emergency Reserve in September
- AG&P LNG Acquires 49% Stake in Vietnam's Cai Mep LNG Terminal
- BP's Carbon Emissions Increase in 2023, Ending Decline Since 2019
- Texas Sues EPA Over Methane Emission Rules for Oil and Gas Sector
Comments