Few Pipeline Inspections Reported After Fatal Colorado Gas Blast
DENVER (AP) — Colorado regulators say few energy companies have reported the results of state-ordered inspections of oil and gas pipelines after a natural gas explosion killed two people.
Colorado Oil and Gas Conservation Commission Director Matt Lepore warned Tuesday the state could order operators to shut down wells connected to pipelines that haven’t been checked by the deadline.
The commission ordered inspections and tests of pipelines within 1,000 feet (300 meters) of buildings after the April 17 explosion in the town of Firestone. Investigators blamed the explosion on odorless, unrefined gas from a small severed pipeline.
The May 2 order covered flow lines, which connect wells to storage tanks and other collection points. The state told operators to inspect flow lines by May 30 and test them for leaks by June 30.
Related News
Related News
- Keystone Oil Pipeline Resumes Operations After Temporary Shutdown
- U.S. House Passes Bill to Reverse Biden's LNG Pause
- Mexico Orders Seizure of Hydrogen Plant at Pemex Oil Refinery
- EnCap Eyes $5 Billion Sale of Bakken Shale Producer Grayson Mill
- Sunoco to Acquire NuStar Energy in $7.3 Billion Deal for Midstream Expansion
- U.S. Regulators Approve Mexico Pacific LNG's Saguaro Connector Pipeline
- U.S. to Acquire 3 Million Barrels of Oil for Emergency Reserve in September
- AG&P LNG Acquires 49% Stake in Vietnam's Cai Mep LNG Terminal
- BP's Carbon Emissions Increase in 2023, Ending Decline Since 2019
- Texas Sues EPA Over Methane Emission Rules for Oil and Gas Sector
Comments