Contract Awarded for 2nd Phase of TurkStream Pipeline Build
Allseas Group has received a contract from South Stream Transport B.V. to construct the second string of the TurkStream gas pipeline’s offshore section.
The company plans to utilize its Pioneering Spirit, the world’s largest construction vessel, to lay more than 559 miles of pipe across the seabed for the second string of the pipeline.
The TurkStream Pipeline will start on the Russian coast near the town of Anapa and run over 900 kilometers through the Black Sea to come ashore in the Thrace region of Turkey. The offshore component of the system will consist of two parallel pipelines running through the Black Sea, terminating near the village of Kiyikoy.
From Kiyikoy, an underground pipeline will be developed connecting TurkStream to the existing pipeline network at Luleburgaz. From there, the route will continue to its end point at the Turkey-Europe border.
Related News
Related News
- Keystone Oil Pipeline Resumes Operations After Temporary Shutdown
- U.S. House Passes Bill to Reverse Biden's LNG Pause
- Mexico Orders Seizure of Hydrogen Plant at Pemex Oil Refinery
- EnCap Eyes $5 Billion Sale of Bakken Shale Producer Grayson Mill
- Sunoco to Acquire NuStar Energy in $7.3 Billion Deal for Midstream Expansion
- U.S. Regulators Approve Mexico Pacific LNG's Saguaro Connector Pipeline
- U.S. to Acquire 3 Million Barrels of Oil for Emergency Reserve in September
- AG&P LNG Acquires 49% Stake in Vietnam's Cai Mep LNG Terminal
- BP's Carbon Emissions Increase in 2023, Ending Decline Since 2019
- Texas Sues EPA Over Methane Emission Rules for Oil and Gas Sector
Comments