PennEast Files with FERC for 26 Route Modifications in Pennsylvania
PennEast Pipeline Company has filed with the Federal Energy Regulatory Commission (FERC) 26 route deviations in Pennsylvania.
Examples include:
• In Luzerne County, PennEast, in conjunction with landowner consultation, is altering the Pipeline’s current route and relocating the proposed Auburn/Leidy/Transco Meter Station. The proposed Pipeline will now be co-located with a Williams-Transco pipeline, and the meter station will now be co-located with an existing UGI Utilities meter station.
• Also in Luzerne County, PennEast is working with what is known locally as Popple Quarry to re-route the Pipeline to avoid active quarry operations. The proposed location will co-locate the proposed Pipeline with a Pennsylvania Power & Light (PP&L) easement within the existing asphalt operation. This location will minimize impacts related to quarry operations as it will be outside the minimum distance Pennsylvania regulations require for the quarry operator to take special precautionary measures. It also will be well outside the range PennEast’s technical experts deem necessary to avoid adverse impacts on the Pipeline by quarry activities.
• Owners of the Blue Mountain Ski Resort in Carbon County are working with PennEast to align the Pipeline’s path with a different ski slope than the one originally designated. This deviation avoids a hang gliding area and further avoids existing underground infrastructure – without increasing the potential for adverse environmental impact – while still directly benefitting a local employer.
• In consultation with the Pennsylvania Game Commission, in Carbon and Northampton counties, PennEast modified the crossing location of the Appalachian Scenic Trail to accommodate a trenchless crossing of the trail and the implied 400-foot buffer area surrounding the trail to avoid impacts to the trail’s scenic viewshed.
Related News
Related News
- Keystone Oil Pipeline Resumes Operations After Temporary Shutdown
- U.S. House Passes Bill to Reverse Biden's LNG Pause
- Mexico Orders Seizure of Hydrogen Plant at Pemex Oil Refinery
- EnCap Eyes $5 Billion Sale of Bakken Shale Producer Grayson Mill
- Sunoco to Acquire NuStar Energy in $7.3 Billion Deal for Midstream Expansion
- U.S. Regulators Approve Mexico Pacific LNG's Saguaro Connector Pipeline
- U.S. to Acquire 3 Million Barrels of Oil for Emergency Reserve in September
- AG&P LNG Acquires 49% Stake in Vietnam's Cai Mep LNG Terminal
- BP's Carbon Emissions Increase in 2023, Ending Decline Since 2019
- Texas Sues EPA Over Methane Emission Rules for Oil and Gas Sector
Comments