Gulf Interstate Wins Wright Interconnect Contract

July 2013, Vol. 240 No. 7

Gulf Interstate Engineering Company is providing engineering, procurement and construction management services on Iroquois Gas Transmission System, L.P.’s Wright Interconnect Project.

This involves addition of a compression facility that includes the associated inlet gas filtering, exit cooling, gas mixing, odorization, metering, flow control, and modification of existing station piping to allow limited back-up between the new and existing facility.

These modifications will expand facilities at the Wright Compressor Station to move an additional 650,000 Dth/d of natural gas from the proposed 120-mile Constitution Gas Pipeline to the Iroquois/Tennessee Gas Pipeline system. The anticipated in-service date is March 2015.