ENI Begins Gulf of Mexico Production

July 2011, Vol. 238 No. 7

ENI has started production from the Appaloosa field in the U.S. Gulf of Mexico, 60 miles off the Louisiana coast.

Production began June 21 through a subsea development and a 20-mile flow line tied back to the Corral Platform. The well is flowing at a rate of 7,000 boe/d. This is the second Eni field producing on the Corral Platform.